Frequently Asked Questions
- Do you offer international shipping for your products? ❯
- How can I pay for my order on Balticdiag.com? ❯
Your shopping cart is empty!
Shipping Notice: Free delivery does not apply to this item. Delivery costs are calculated based on your location. Please contact us for a shipping quote before or after placing your order.

The BD-S4 recessed double scissor lift is a high-performance 3500 kg car lift designed for professional automotive workshops, garages, and service centers. Its recessed design provides a low initial height, allowing easy vehicle access and making it ideal for passenger cars and light commercial vehicles. Equipped with a smooth electro-hydraulic lifting system, the lift ensures synchronized and stable operation under intensive daily use. The compact folding scissor design optimizes workshop space, while its robust steel construction guarantees long-term reliability and safety. This automotive recessed scissor lift is perfect for routine maintenance, inspections, undercarriage servicing, and complex repairs. With integrated safety features and intuitive electronic controls, the BD-S4 combines efficiency, convenience, and professional-grade performance.
a
The recessed double scissor lift BD-S4 is a reliable choice for automotive service centers seeking efficient workflow, a high level of safety, and long-lasting equipment. By choosing this lift, you invest in a robust construction, smooth operation, and a professional solution designed for intensive daily use.
Yes, we offer fast international express delivery for all products available at BalticDiag.com. We deliver worldwide — including the USA, Europe, North America, South America, Asia, Africa, and Australia — using trusted courier services such as DHL, UPS, and FedEx. Every order is shipped with express delivery straight to your door, ensuring a quick and secure arrival. Shipping fees are included in the product price, and we provide full tracking information so you can monitor your package from dispatch to delivery.
Please note that some products include free delivery, while others require confirmation of shipping costs before purchase. In most cases, pallet-sized packages have additional delivery charges that must be calculated in advance by our sales team.
We accept a wide range of secure global and local payment methods, including:


The installation of an in-ground scissor lift requires careful planning before the workshop floor is completed. The lift position, installation pits, concrete foundation, drainage, electrical connections and available working space should all be considered in advance.
This guide describes the main preparation and installation stages for the BD-S4 recessed double scissor lift, helping workshops understand what should be considered before and during installation.
The first step is to determine the exact position of the lift in the workshop. The vehicle entry direction, available working space, distance from walls and doors, and position of other workshop equipment should all be considered.
Do not plan the installation based only on the dimensions of the lift. Leave enough space around the vehicle for technicians to work comfortably and for workshop equipment to be used.
The height of the workshop should also be checked. For the BD-S4, the maximum lifting height is 2030 mm, so the height of the vehicle and any structures above it must be considered before selecting the final position.

Check the position of garage doors, rails, beams, lighting, ventilation ducts and other equipment above the vehicle. Once the concrete floor has been completed, changing the lift position can become a much more complicated construction job.

Once the lift position has been established, the two installation pits can be prepared. The BD-S4 requires two separate pits for its lifting mechanisms.
The planned pit depth is approximately 330 mm. Before construction begins, carefully check the pit length, width, depth, distance between the pits and diagonal measurements.
The final position of the pits should also be considered together with the finished floor level. Accurate positioning is important for correct alignment of the lifting platforms.
Before continuing with the construction work, verify all dimensions against the installation documentation supplied with the specific lift. The final requirements may depend on the lift model and the conditions of the building.
Drainage should be considered before the concrete floor is completed. Water, snow, dirt and road salt can enter the pits during normal workshop operation.
Workshop maintenance can also involve oil, fuel, hydraulic fluid and other technical liquids. A suitable fluid collection system should therefore be planned for the installation pits.
Depending on the workshop infrastructure, a separate collection sump or reservoir can be used to collect liquids and allow them to be removed when necessary.

The exact drainage and fluid management solution should be selected according to the workshop infrastructure, intended use and applicable local requirements.

After the foundation and required utilities have been prepared, the two installation pits can be formed.
The openings must be positioned accurately according to the lift installation requirements. The final geometry of the pits determines the position of the lifting mechanisms and the alignment of the platforms.
Particular attention should be paid to the upper level of the pits. The pit edges must be positioned correctly so that the platforms can align with the finished workshop floor when the lift is fully lowered.
The edges of the installation pits should be protected from damage during construction and later workshop operation.
A metal angle profile can be installed around the pit edges to provide additional protection against impacts from workshop equipment and everyday use.
A suitable corrosion-resistant material can be considered for workshop environments where moisture, dirt and road salt may be present.


Once the pits have been formed, the reinforcement and concrete foundation can be prepared.
The foundation is an important part of the installation because significant loads are transferred to the floor structure during lift operation.
For the BD-S4 installation, the concrete foundation under the lift area should be more than 200 mm thick.
The foundation requirements should always be checked against the manufacturer's installation documentation and the structural conditions of the building. If necessary, the floor construction should be assessed by a qualified professional before the installation begins.
Electrical connections and other utilities required for the lift should be planned before the concrete floor is completed.
The BD-S4 can be supplied with either 400 V / 50 Hz / 3-phase or 230 V / 50 Hz / 1-phase power, depending on the configuration.
The position of the control unit and the routing of the required connections should be considered together with the lift position and workshop layout.

Planning these connections before the floor is completed makes the installation easier and avoids unnecessary modifications after the concrete has been finished.

Once the pits, reinforcement, drainage and utilities are ready, the remaining floor structure can be concreted.
The final concrete level is particularly important. The finished floor height must correspond with the upper edges of the pits and the final position of the lift platforms.
The aim is for the platforms to be properly integrated with the workshop floor when the lift is fully lowered.
Before the concrete work is completed, check the pit dimensions, alignment, floor levels and all required connections once again. Corrections are considerably easier before the floor has been finished.
After the concrete has reached the required condition, the installation pits should be prepared for the lifting mechanisms.
Check the internal pit surfaces, pit edges, utility openings, drainage system and final dimensions before placing the lift components.
This is the final opportunity to make corrections before the lifting mechanisms are installed and access becomes more difficult.


Once the construction and preparation work has been completed, the lifting mechanisms can be positioned in their respective pits.
For the BD-S4, the two lifting mechanisms are installed separately and connected to the control unit and hydraulic system.
The platforms must be correctly positioned and aligned with the finished workshop floor.
After the lifting mechanisms have been installed, the hydraulic and electrical connections can be completed according to the manufacturer's installation requirements.
The lift should then be adjusted and tested before it is used with a vehicle.
The BD-S4 uses hydraulic cylinder synchronisation and incorporates mechanical and hydraulic safety systems as part of its lifting system.

Before using the lift, check the complete installation and make sure that all systems operate correctly.
Any commissioning and safety checks should be carried out according to the manufacturer's documentation before the lift is put into normal workshop operation.
An in-ground scissor lift should ideally be selected and positioned before the workshop floor is constructed. The installation pits, concrete foundation, drainage, electrical connections and finished floor level can then be incorporated into the workshop design from the beginning.
The dimensions mentioned in this guide, including the approximately 330 mm pit depth, more than 200 mm concrete foundation thickness and 2030 mm maximum lifting height, refer to the BD-S4 installation described here.
Always check the current installation documentation supplied with the specific lift before starting construction work. Foundation, pit, electrical and installation requirements may vary depending on the lift model and building conditions.
Careful preparation before the concrete floor is completed can help avoid unnecessary modifications later and ensure that the lift is properly integrated into the workshop.
If you are planning to install a BD-S4 or another in-ground scissor lift, contact the BalticDiag team before starting the floor construction to discuss the installation requirements and workshop preparation.
The installation of an in-ground scissor lift requires careful planning before the workshop floor is completed. The lift position, installation pits, concrete foundation, drainage, electrical connections and available working space should all be considered in advance.
This guide describes the main preparation and installation stages for the BD-S4 recessed double scissor lift, helping workshops understand what should be considered before and during installation.
The first step is to determine the exact position of the lift in the workshop. The vehicle entry direction, available working space, distance from walls and doors, and position of other workshop equipment should all be considered.
Do not plan the installation based only on the dimensions of the lift. Leave enough space around the vehicle for technicians to work comfortably and for workshop equipment to be used.
The height of the workshop should also be checked. For the BD-S4, the maximum lifting height is 2030 mm, so the height of the vehicle and any structures above it must be considered before selecting the final position.

Check the position of garage doors, rails, beams, lighting, ventilation ducts and other equipment above the vehicle. Once the concrete floor has been completed, changing the lift position can become a much more complicated construction job.

Once the lift position has been established, the two installation pits can be prepared. The BD-S4 requires two separate pits for its lifting mechanisms.
The planned pit depth is approximately 330 mm. Before construction begins, carefully check the pit length, width, depth, distance between the pits and diagonal measurements.
The final position of the pits should also be considered together with the finished floor level. Accurate positioning is important for correct alignment of the lifting platforms.
Before continuing with the construction work, verify all dimensions against the installation documentation supplied with the specific lift. The final requirements may depend on the lift model and the conditions of the building.
Drainage should be considered before the concrete floor is completed. Water, snow, dirt and road salt can enter the pits during normal workshop operation.
Workshop maintenance can also involve oil, fuel, hydraulic fluid and other technical liquids. A suitable fluid collection system should therefore be planned for the installation pits.
Depending on the workshop infrastructure, a separate collection sump or reservoir can be used to collect liquids and allow them to be removed when necessary.

The exact drainage and fluid management solution should be selected according to the workshop infrastructure, intended use and applicable local requirements.

After the foundation and required utilities have been prepared, the two installation pits can be formed.
The openings must be positioned accurately according to the lift installation requirements. The final geometry of the pits determines the position of the lifting mechanisms and the alignment of the platforms.
Particular attention should be paid to the upper level of the pits. The pit edges must be positioned correctly so that the platforms can align with the finished workshop floor when the lift is fully lowered.
The edges of the installation pits should be protected from damage during construction and later workshop operation.
A metal angle profile can be installed around the pit edges to provide additional protection against impacts from workshop equipment and everyday use.
A suitable corrosion-resistant material can be considered for workshop environments where moisture, dirt and road salt may be present.


Once the pits have been formed, the reinforcement and concrete foundation can be prepared.
The foundation is an important part of the installation because significant loads are transferred to the floor structure during lift operation.
For the BD-S4 installation, the concrete foundation under the lift area should be more than 200 mm thick.
The foundation requirements should always be checked against the manufacturer's installation documentation and the structural conditions of the building. If necessary, the floor construction should be assessed by a qualified professional before the installation begins.
Electrical connections and other utilities required for the lift should be planned before the concrete floor is completed.
The BD-S4 can be supplied with either 400 V / 50 Hz / 3-phase or 230 V / 50 Hz / 1-phase power, depending on the configuration.
The position of the control unit and the routing of the required connections should be considered together with the lift position and workshop layout.

Planning these connections before the floor is completed makes the installation easier and avoids unnecessary modifications after the concrete has been finished.

Once the pits, reinforcement, drainage and utilities are ready, the remaining floor structure can be concreted.
The final concrete level is particularly important. The finished floor height must correspond with the upper edges of the pits and the final position of the lift platforms.
The aim is for the platforms to be properly integrated with the workshop floor when the lift is fully lowered.
Before the concrete work is completed, check the pit dimensions, alignment, floor levels and all required connections once again. Corrections are considerably easier before the floor has been finished.
After the concrete has reached the required condition, the installation pits should be prepared for the lifting mechanisms.
Check the internal pit surfaces, pit edges, utility openings, drainage system and final dimensions before placing the lift components.
This is the final opportunity to make corrections before the lifting mechanisms are installed and access becomes more difficult.


Once the construction and preparation work has been completed, the lifting mechanisms can be positioned in their respective pits.
For the BD-S4, the two lifting mechanisms are installed separately and connected to the control unit and hydraulic system.
The platforms must be correctly positioned and aligned with the finished workshop floor.
After the lifting mechanisms have been installed, the hydraulic and electrical connections can be completed according to the manufacturer's installation requirements.
The lift should then be adjusted and tested before it is used with a vehicle.
The BD-S4 uses hydraulic cylinder synchronisation and incorporates mechanical and hydraulic safety systems as part of its lifting system.

Before using the lift, check the complete installation and make sure that all systems operate correctly.
Any commissioning and safety checks should be carried out according to the manufacturer's documentation before the lift is put into normal workshop operation.
An in-ground scissor lift should ideally be selected and positioned before the workshop floor is constructed. The installation pits, concrete foundation, drainage, electrical connections and finished floor level can then be incorporated into the workshop design from the beginning.
The dimensions mentioned in this guide, including the approximately 330 mm pit depth, more than 200 mm concrete foundation thickness and 2030 mm maximum lifting height, refer to the BD-S4 installation described here.
Always check the current installation documentation supplied with the specific lift before starting construction work. Foundation, pit, electrical and installation requirements may vary depending on the lift model and building conditions.
Careful preparation before the concrete floor is completed can help avoid unnecessary modifications later and ensure that the lift is properly integrated into the workshop.
If you are planning to install a BD-S4 or another in-ground scissor lift, contact the BalticDiag team before starting the floor construction to discuss the installation requirements and workshop preparation.
The VOLVO VOCOM 2+ (88894400) is the enhanced version of the VOCOM II diagnostic interface, offering improved performance and robustness compared to the standard VOCOM II 88894000.
The VOLVO VOCOM 2+ (88894400) is the enhanced version of the VOCOM II diagnostic interface, offering improved performance and robustness compared to the standard VOCOM II 88894000.
Cable 0171381 Electric 7 Pin - 4 Pin for STILL CANBOX Interface
Cable 0171381 Electric 7 Pin - 4 Pin for STILL CANBOX Interface